CIVIL ENGINEERING PROJECT PROFILE
Wastewater Treatment Plant Upgrade, Village of Lake George, NY
|
|
|
|
C.T. Male was engaged to provide the report, design, bidding and construction phase services for upgrading the Village of Lake George wastewater treatment facilities. This was part of Phase I of Warren County Lake George Basin improvement project, funded by a special EPA grant. WWTP upgrade includes replacement of mechanical equipment in the east and west clarigesters; cleaning, repairing and coating of structural concrete; cleaning and painting the superstructure, structural steel and walkway in the east and west clarigesters; replacement of the drive unit for the east clarigester; installation of a new secondary settling tank with cover; replacement of chains and flights in both existing rectangular secondary settling tanks; new sludge well with piping and telescoping valve; filter recirculation pumps, suction line and 6” discharge force main; chemical tank enclosure building; and demolition. Electrical work includes providing power and control wiring to all new facilities, and furnishing and installing switch gear, alarms and controls.