LAND SURVEYING PROJECT PROFILE
Surveying Services for Cogeneration Plant & Paper Recycling Plant
C.T. Male has prepared ALTA/ACSM land title surveys of the plant’s properties, proposed realty subdivision mapping and performed a hydrographic survey of a portion of the Hudson River for a direction drill design. The Cogeneration plant will be natural gas fired, and C.T. Male has prepared topographic surveys, wetlands surveys and right-of-way determinations for the six-mile pipeline corridor. Additionally, a 345 KV interconnect power line will be constructed for which C.T. Male has prepared topographic surveys, wetland surveys and right-of-way determinations for the eight-mile corridor. Project control and photogrammetric ground control has been established using GPS technology. To date more than 8100 man-hours have been spent on the project, which includes over 1000 man-hours spent on differential, RTK and Sub-Meter GPS for photogrammetric ground control, wetlands surveys, project control and utility locations, hydrographic surveys and stakeout.